Installation steps for industrial lift doors

1.Verify door opening size


2. Installation of auxiliary rails The dimensions of auxiliary rails should be 70mm longer than the length of the door panel. Pay attention to verticality during installation.


3. Fixed track. Be sure to pay attention to the slope when installing the track. The track will tilt 25px for every 1 meter of doorway rise. The distance between the bottom rail and the wall should be 50mm, the rail joints should be aligned, and the auxiliary rail and L angle connection should be fixed with M8 carriage bolts and flange females. The L angle for fixing is made of porous angle iron. The fixing must be firm.


4. Set the torsion spring center bracket, nylon rubber ring, fixed flange, torsion spring that matches the weight of the door body, lock the flange, the sheave, and the bearing bracket on the central shaft tube in order (distinguish left and right sides). And pay attention to whether all parts are installed correctly.


5. Install the door panel. Find the first board. The bottom of this board has a square tube inside, and the door is also lined with iron. It is used to fix the anti-break device. Generally, the door is marked with a bottom or 1. After finding out, install the bottom seal on the groove of the bottom plate, prevent the knife from breaking on both sides, and fix it with M5.5 drill tail. The bottom seal is fixed with 5 rivets with a diameter of 5 mm. The door panel is tilted and the roller is installed. Press the anti-break knife slowly to make the blade edge on the track. Use a horizontal instrument to find the level. Level, start to install large hinges on both sides, and install door panels in order. Observe the connection gap on the front when fixing. After the fixing is completed, divide the middle hinges evenly.


6. Give the torsion spring a boost. Put one end of the wire rope loop on the bottom wheel on the hook shaft of the bottom wheel bracket, and apply force to the torsion spring according to the specified tightening table. Do not exceed or lower than the specified number of turns by half a turn. The other end is hung on the reel, tighten the wire rope, lock the reel, then lock the locking flange, and remove the pinned steel rod.


7, install the motor, pay attention to adjusting the coordination of various parts.


Up:
Down:
Back to list
Technical Support:Rya
  • No.188 Shixue Road, Zhifu District, Yantai City,
    Shandong Province
  • Tel:0535-6846120 6846130
  • Mobile:13806386636
  • Postcode:264000
  • Fax:0535-6846160
  • E-mail:[email protected]

Scan to join us

Copyright ? Yantai Okedoor Industry Co., Ltd. Welcome to inquire!
主站蜘蛛池模板: 亚洲av无码国产精品草莓在线 | 日韩 欧美 自拍 | 久草在线免费看 | 99国产精品高清一区二区二区 | 亚洲av成人片无码网站网 | 欧美国产成人精品一区二区三区 | 亚洲国产成人久久一区二区三区 | 奇米影音四色 | 成人在线视频网址 | 日韩成人av在线 | 性久久久久久久久波多野结衣 | 亚洲成片在线观看12345ba | 交性大片欧美多人 | 亚无码乱人伦一区二区 | 亚洲精品一区二三区在线观看 | 亚洲av中文无码乱人伦在线观看 | 波多野吉衣在线视频 | 欧美日韩精选 | 国产欧美第一页 | 国产亚洲福利在线视频 | 国产精品午睡沙发系列 | 欧美手机看片 | sese综合| 妺妺窝人体色www婷婷 | 香港国产特级一级毛片 | 人妻体内射精一区二区三四 | 亚洲人成电影在线观看天堂色 | 天天草夜夜骑 | 国产视频精品免费 | 奇米影视狠狠久久中文 | 久久免费网 | 国产AV亚洲精品久久久久 | 久久丫精品国产 | 男人的天堂免费a级毛片无码 | 日本天堂免费a | 国产福利自产拍在线观看 | 亚洲av无码精品国产成人 | 免费视频国产在线观看 | 精品免费久久久久欧美亚一区 | 成人妇女免费播放久久久 | 久久精品国产一区二区三区 |