NEWS

Current position:首頁 >> NEWS >> Corporate News

Casement door construction technology

The construction process of the casement door is as follows:


I. Process flow: find the rules of the elastic line → door opening processing → casement door processing → casement door transportation, positioning → casement door frame installation → → plugging around the doorway → casement door installation → hardware accessories installation → cleaning, acceptance


Second, the operation points:


1. Finding the rules with the elastic line: Find the doorline at the high level, draw down the doorline with a large wire drop, and draw a line at the doorway of each floor to shave the edges of individual non-straight mouths. High-rise buildings can use theodolite to find the vertical line. The horizontal position of the doorway should be based on the floor + 50cm horizontal line.


2. Installation position in the wall thickness direction: Determine the installation position of the casement door in the wall thickness direction according to the large-scale drawing of the external wall;


3. Placement and temporary fixing: According to the installed installation line, hang it straight. No problem can be temporarily fixed with wooden wedges.


4. Fix with the wall: Fix the iron piece with the wall with a nail gun, and the distance between the iron pieces should be less than 600mm. At the same time, ensure that there are not less than two fixing pieces on each side.


5. Door frame caulking: After fixing the casement door, it should be caulked in time. Waterproof mortar is used for the plug seam. The base layer must be cleaned before the plug seam. Brush a plain cement slurry and use a 1: 2.5 waterproof mortar to plug the seam. It is required to be full and tight. Wedge, the same way to fill wood wedge holes.


6.Swing door installation: The door frame is connected by aluminum corner code, the specific method is the same as that of the door frame.


7. Installation hardware accessories: After the slurry is repaired, the hardware accessories of the doors and windows can be installed after the oil painting is completed. For the installation process, please refer to the product manual. The installation is required to be firm and flexible.


Up:
Down:
Back to list
Technical Support:Rya
  • No.188 Shixue Road, Zhifu District, Yantai City,
    Shandong Province
  • Tel:0535-6846120 6846130
  • Mobile:13806386636
  • Postcode:264000
  • Fax:0535-6846160
  • E-mail:[email protected]

Scan to join us

Copyright ? Yantai Okedoor Industry Co., Ltd. Welcome to inquire!
主站蜘蛛池模板: 色综合视频一区二区观看 | 天天看夜夜 | 草草电影 | 久久婷婷影院 | 久久综合色区 | 人妻丰满熟妇av无码区不卡 | 亚洲精品久久婷婷丁香51 | 色网站在线看 | 四虎在线视频免费观看 | 日本免费在线一区 | 国产精品黄在线观看免费软件 | 国产精品无码专区在线播放 | 日本在线观看网站 | 大色综合 | 精品一卡2卡三卡4卡免费观看 | 欧美午夜在线观看 | 污的网站免费 | 日本黄视色视频在线观看 | 天天操操操操操操 | 色综合天天综合网国产成人 | 欧美激情在线精品一区二区 | 人妻内射一区二区在线视频 | 扒开女人内裤猛进猛出免费视频 | 国产一区二区三区四区五区加勒比 | 日韩福利网站 | 亚洲欧美日韩综合一区 | 日韩视频高清免费看 | 欧美成人午夜在线全部免费 | 亚洲精品视频在线免费 | 精品无码久久久久久久动漫 | 天天综合天天做天天综合 | jiucao在线观看精品 | 欧美精品久久天天躁免费观看 | 国内视频精品 | 亚洲国产成人精品无码区在线播放 | 蜜臀久久99精品久久久久久小说 | 色综合久久综合中文小说 | 欧美性精品不卡在线观看 | 国产精品国产三级国产av剧情 | 图片一区| 国产亚洲一区二区精品 |